What was found and what was fixed
Tasks opened and completed during the period, what is still outstanding, and what is waiting for someone to review it.
Reporting and records
A grant application, a board meeting and a landowner asking what you did this season all want the same four facts, and they all come months after the work. Your reports should add up what actually happened, instead of relying on anyone's memory.
The period report
Pick any period and any network. Everything below comes from entries your team already made, so nobody has to remember a number.
Tasks opened and completed during the period, what is still outstanding, and what is waiting for someone to review it.
Hours logged against the tasks they were spent on, with paid and volunteer time counted separately, along with the expenses and materials that went with them.
Crew and costsWorked out day by day from your own condition updates, with every closure and reopening counted, so you can say how much of the season the trails were open.
Rainfall and snowfall totals, high and low temperatures, the strongest gust and the wettest day of the period, shown next to the closures so you can see why they happened.
Trail conditionsReport on one area for the landowner who owns it, or on the whole organization for your board.
Maintenance, structures, trails, points of interest and counter readings can each be exported as a spreadsheet to work with or a PDF to attach to an application.
Seasonal checklists
A year later, the hardest thing to prove is that a routine inspection round was done at all. A completed checklist is that proof, and you create it simply by doing the round.
A spring opening sweep, a pre-season bridge check or a post-storm check. You write the checklist once and reuse it, so you are not rebuilding it every April.
Start it from the field app at the trailhead, with no signal needed. It is dated and recorded under the name of whoever did the round.
You can add up to four photos to each item, taken right where you checked it.
Flagging an item creates a maintenance task, linked back to the checklist. If you change your mind, clear the flag before anyone starts work. Flag it again later and it goes back to the same task instead of creating a second one.
Finished or still open, it keeps every item's result and photos. That is exactly what you need when someone asks "when did you last check this?"
Records that hold up
Each of these records comes from doing the work, not from a separate reporting chore, which is why they stay accurate.
Every inspection of that bridge, dated, with its answers, photos and the condition rating it gave. When someone asks for it, you have it.
InfrastructureSee who changed it, when, and what was said about it until it was fixed. It stays with the task instead of getting lost in a group chat.
MaintenanceA daily report gathers the day's condition changes, work and notes into one page, built from what already happened. You can publish it for your visitors.
Your public siteWhen a contractor works on a trail you shared with them, the task is labeled with their company name. A year later you can still tell your crew's work from theirs.
In the documentation
Step-by-step guides for setting each of these up.
You can only report on a season you recorded while it was happening. Start free and get your first inspection on record this week.